This study aims to analyze the operational effectiveness of the Ripple Mill machine using a TPM maintenance strategy approach by measuring OEE. The method used is descriptive quantitative, with primary data from observations and interviews, and secondary data from factory operational documentation. The evaluation was based on three leading OEE indicators: availability, performance, and quality. It was complemented by an analysis of the six significant losses to identify sources of lost production time. The results show that the average OEE value from January to March 2025 reached 96.53%, exceeding the international standard of ≥85%. The most significant losses came from equipment breakdowns (69.75%), followed by minor breakdowns and idling (18.48%). Preventive maintenance programs, operator training, and spare parts availability are recommended. These results demonstrate the effectiveness of the TPM approach in continuously improving machine performance.

References

Anam, V., dan Sukanta. 2022. “Analisis Penerapan Total Productive Maintenance (TPM) untuk Mendapatkan Nilai Overall Equipment Effectiveness (OEE) di PT. XYZ.” Jurnal Ilmiah Wahana Pendidikan 8 (13): 75–81.

Bakhtiar, B., dan S. Syukriah. 2016. “Analisis Overall Equipment Effectiveness (OEE) dalam Meminimalisir Six Big Losses pada Mesin Produksi Pengolahan Minyak Kelapa di UD. Hidup Baru.” Industrial Engineering Journal 5 (2): 52–57.

Effendi, Z., dan S. Wahyuni. 2022. “Application Design of Calculation Fresh Fruit Palm Oil Material Balance Based on Android.” Proceedings The 1st Annual Dharmawangsa Islamic Studies International Conference, 116–130.

Eshardiansyah, M. C., F. N. Azizah, dan W. Wahyudin. 2024. “Analisis Mesin CNC Milling dengan Metode Overall Equipment Effectiveness dalam Mendeteksi Six Big Losses di PT. A.” Industrika: Jurnal Ilmiah Teknik Industri 8 (2): 227–237.

Hamdy, M. I. 2017. “Analisis Nilai Overall Equipment Effectiveness (OEE) pada Mesin Ripple Mill.” Jurnal Teknik Industri: Jurnal Hasil Penelitian dan Karya Ilmiah dalam Bidang Teknik Industri 3 (1): 53.

Islami, I. A. 2023. “Penerapan Preventive Maintenance pada Turbin Uap di PLTU Rembang.” Jurnal Energi dan Manufaktur 15 (1): 42.

Larasati, N., S. Chasanah, S. Machmudah, dan S. Winardi. 2016. “Studi Analisa Ekonomi Pabrik CPO (Crude Palm Oil) dan PKO (Palm Kernel Oil) dari Buah Kelapa Sawit.” Jurnal Teknik ITS 5 (2).

Muhaemin, G., dan A. E. Nugraha. 2022. “Penerapan Total Productive Maintenance (TPM) pada Perawatan Mesin Cutter di PT. XYZ.” Jurnal Ilmiah Wahana Pendidikan 8 (9): 205–219.

Muslih Nasution, Ahmad Bakhori, dan W. N. 2021. “Manfaat Perlunya Manajemen Perawatan untuk Bengkel maupun Industri.” Buletin Utama Teknik 3814: 248–252.

Mustaqim, I. Q., E. Pudji W., dan D. Sukma D. 2020. “Penentuan Interval Perawatan Mesin Extruder dengan Modularity Design dan Overall Equipment Effectiveness di PT. XYZ.” Juminten: Jurnal Manajemen Industri dan Teknologi 1 (2): 152–163.

Musyafa’ah, M., dan A. Sofiana. 2022. “Analysis of Total Productive Maintenance (TPM) Application Using Overall Equipment Effectiveness (OEE) and Six Big Losses on Disamatic Machine PT. XYZ.” Opsi 15 (1): 56.

Pada Mulia Raja, Zulham Effendi, dan Calvin Arnico Lase. 2022. “Upaya Peningkatan Performance Mesin Screw Press Berdasarkan Nilai Idling dan Minor Stoppages dan Reduced Speed di Pabrik Kelapa Sawit Kapasitas 30.” Jurnal Agro Fabrica 4 (2): 60–73.

Prabowo, R. F., H. Hariyono, dan E. Rimawan. 2020. “Total Productive Maintenance (TPM) pada Perawatan Mesin Grinding menggunakan Metode Overall Equipment Effectiveness (OEE).” Journal Industrial Servicess 5 (2).

Purnama, A. T. 2018. “Analisis Nilai Overall Equipment Effectiveness (OEE) untuk Meningkatkan Efektivitas Mesin Heavy Duty di PT. Tembaga Mulia Semanan, Tbk.” Jurnal Ilmiah Teknologi dan Rekayasa 6: 1–13.

Putra, R. N. 2020. “Analisis Hasil Kinerja Mesin Ripple Mill di Stasiun Pengolahan Biji Pabrik Kelapa Sawit.” Academia, 1–63.

Rahayu, A. 2016. “Evaluasi Efektivitas Mesin Kiln dengan Penerapan Total Productive Maintenance pada Pabrik II/III PT Semen Padang.” Jurnal Optimasi Sistem Industri 13 (1): 454.

Ramadhani, A. G., D. Z. Azizah, F. Nugraha, dan M. Fauzi. 2022. “Analisa Penerapan TPM (Total Productive Maintenance) dan OEE (Overall Equipment Effectiveness) pada Mesin Auto Cutting di PT XYZ.” Jurnal Ilmiah Teknik dan Manajemen Industri 2 (1): 59–69.

Septiani, D. T., E. Nursanti, dan H. Galuh. 2020. “Analisa Peningkatan Produktivitas dengan Menggunakan Metode TPM Berdasarkan Nilai OEE dan Losses Mesin di Advertising Ozy Bisa.” Jurnal Valtech 3 (2): 41–45.

Siregar, K., dan D. H. Rizkiansyah. 2022. “Analisis Efektivitas Mesin Ripple Mill Menggunakan Metode Overall Equipment Effectiveness (OEE).” Talenta Conference Series: Energy & Engineering 5 (2): 0–7.

Ulimaz, A., S. N. Hidayah, dan Y. Ningsih. 2021. “Analisis Oil Losses pada Proses Pengolahan Minyak Inti Kelapa Sawit di PT XYZ dengan Metode Seven Tools.” Oil Losses Analysis of Palm Kernel Oil Processing Using Seven Tools Method 8 (2): 124–134.