Implementing Lean Manufacturing by Using Value Stream Mapping to Identify and Reduce Waste in the PT Manhattan Warehouse

Authors

  • Marlen Feri Pardosi Universitas Harapan Medan
  • Riana Puspita Universitas Harapan Medan
  • M. Fazri Pasaribu Universitas Harapan Medan

DOI:

https://doi.org/10.56862/irajtma.v2i2.48

Keywords:

value stream mapping, waste, lean manufacturing, value added activity, non value added activity

Abstract

PT Manhattan is one of the companies engaged in services that provide apartments, supermarkets, cinemas, and food. This research was conducted in a logistics warehouse, where the problem is the problem of time when storing products in the warehouse. Value Stream Mapping is a design method to reduce the time problem so that it gets the best design. The results of the calculation using the Value stream mapping method to get an efficient improvement design from the actual condition. Then 2 activities are part of the value stream mapping and these two activities are included in the category of non-value-added activities. While operational activities include value-added activities, the total time required for value-added activities is 9,660 seconds, while the time required for non-value activities is 5,100 seconds. So the activity mapping process required for value-added activity is 618,890 seconds while the time required for non-value-added activity is 30,520 seconds from the initial condition. With this research, it is expected that logistic warehouses can arrange and use time as quickly and efficiently as possible so that they can facilitate warehouse activities.

 

References

Arifin, J., & Pamungkas, T. 2019. “Perbaikan Tata Letak Gudang Dengan Menggunakan Metode Shared Storage Pada Perum Bulog Subdivre Karawang”. Jurnal Media Teknik Dan Sistem Industri, 3(1), 7. https://doi.org/10.35194/jmtsi.v3i1.548

Franklin, M. G., & Thomas, H. E. 1989. Manajemen Produksi Dan Operasi.

Harahap, S. 2020. Perencanaan Pabrik (Pertama). Graha Ilmu.

Harsono. 1985. Manajemen Pabrik. Balai Aksara.

Hia, Wankrisman, Abdul Azis Syarif, dan Farida Ariani Daulay. 2023. “Perbaikan Metode Kerja Untuk Meningkatkan Produktivitas Karyawan Pada Bengkel Bubut Saudara Teknik ANO”. IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA) 2 (1):65-73. https://doi.org/10.56862/irajtma.v2i1.40.

James, A. M. 1990. Tata Letak Pabrik Dan Pemindahan Bahan (Ketiga). ITB.

Pasaribu , Jekson Priadi, Uun Novalia Harahap, dan Denny Wallady Utama. 2023. “Analisis Kinerja Supply Chain Manajement Dengan Metode Supply Chain Operation Reference Di PT. Sumber Jaya Indahnusa COY”. IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA) 1 (3):1-9. https://doi.org/10.56862/irajtma.v1i3.23.

Mulyati, E., Numang, I., & Aditya Nurdiansyah, M. 2020. “Usulan Tata Letak Gudang Dengan Metode Shared Storage di PT Agility International Customer PT Herbalife Indonesia.” Jurnal Logistik Bisnis, 10(02), 36–41. https://doi.org/10.46369/logistik.v10i02.955

Mulyati, E., Numang, I., & Nurdiansyah, M. A. 2020. “Usulan Tata Letak Gudang Dengan Metode Shared Storage Di PT. Agilty International Customer PT. Herbalife Indonesia.” Logistik Bisnis, 10, N0.02.

Olivia Audrey, Wayan Sukania, & Siti Rohana Nasution. 2019. “Analisis Tata Letak Gudang Dengan Menggunakan Metode Dedicate Storage.” Jurnal ASIIMETRIK: Jurnal Ilmiah Rekayasa & Inovasi, 1(1), 43–49. https://doi.org/10.35814/asiimetrik.v1i1.221

Ray, Rahul, Yetti Meuthia Hasibuan, dan Denny Walady. 2023. “Analisis Pengaruh Jam Kerja Terhadap Beban Kerja Mental Dengan Metode Subjective Workload Assessment Technique”. IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA) 2 (1):16-23. https://doi.org/10.56862/irajtma.v2i1.29.

Sitepu, Mariras, Abdul Aziz Syarif, dan Uun Novalia Harahap. 2023. “Analisis Defect Pada Proses Produksi Mie Blok Dengan Metode SPC Dan RCA Pada PT. Lestari Alam Segar”. IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA) 2 (1):74-81. https://doi.org/10.56862/irajtma.v2i1.42.

Tambun, Jenny Maruli, M. Fazri Pasaribu, dan Abdul Azis Syarif. 2023. “Analisis Lingkungan Kerja Berdasarkan Tingkat Kebisingan Mesin Di PT. Grahadura Leidong Prima”. IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA) 2 (1):24-33. https://doi.org/10.56862/irajtma.v2i1.36.

Wignjosoebroto, S. 1991. Tata Letak Pabrik dan Pemindahan Bahan.

Published

2023-08-27

How to Cite

Pardosi, M. F. ., Puspita, R. ., & Pasaribu, M. F. . (2023). Implementing Lean Manufacturing by Using Value Stream Mapping to Identify and Reduce Waste in the PT Manhattan Warehouse. IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA), 2(2), 63–68. https://doi.org/10.56862/irajtma.v2i2.48

Issue

Section

Scientific Article