Technical Feasibility Study of Mini Hydro Renewable Energy Potential in Goal Village, East Sahu District, West Halmahera Regency

Authors

  • Riyan Tri Nurharyanto PT. PLN (Persero) Area Kota Ternate
  • Iwan Gunawan Universitas Khairun

DOI:

https://doi.org/10.56862/irajtma.v2i3.85

Keywords:

Energy Potential, Net Zero Emission, PLTM, Power

Abstract

The government has committed to achieving carbon neutrality by 2060 or earlier, with one of the steps to reduce emissions being the endorsement of PT Perusahaan Listrik Negara's General Plan for Electricity Supply (RUPTL) 2021-2030. The RUPTL stipulates that more than half, 51.6% or equivalent to 20.9 Giga Watt (GW), will come from renewable energy sources rather than fossil fuels. The potential of renewable energy, such as mini hydro power plants, is the focus of this effort. Indonesia has great potential in New Renewable Energy (NRE), including 450 MW of mini/micro hydro, with North Maluku alone having a possibility of 145.1 MW. One of the strategic issues at the national level is energy security, particularly in the North Maluku River Basin. The North Halmahera River Basin, which covers West Halmahera Regency, North Halmahera Regency, and Morotai Island Regency, is the primary focus in exploring the potential of micro hydropower plants. To fully utilise the potential of renewable energy and address the strategic issue of energy security, research needs to be conducted on the planning of MHP in Goal Village, with a case study on Akelamo River. The results of the research and analysis show that the water discharge reaches 7.86 m3/det with a head of 16 metres. The potential power that can be generated using Kaplan turbines is 817.21 kW. These steps can serve as a foundation for implementing sustainable MHP development projects. They can contribute significantly to the achievement of net zero emission targets that the government has promised.

References

Administrasi Kabupaten Halmahera Barat. 2013. Diakses pada 18 Juni 2022, dari https://petatematikindo.wordpress.com/2013/04/22/administrasi-kabupaten-halmahera-barat/.

Asdak, C. 2010. Hidrologi dan Pengelolaan Daerah Aliran Sungai. Yogyakarta: Gadjah Mada University Press.

Badan Standarisasi Nasional. 2015. Standar Nasional Indonesia (SNI) SNI 8066:2015 Tata cara pengukuran debit aliran sungai dan saluran terbuka menggunakan alat ukur arus dan pelampung. Jakarta : Dewan Standarisasi Indonesia.

Badaruddin. 2017. Panduan Praktikum Debit Air. Fakultas Kehutanan Universitas Lambung Mangkurat Banjarbaru.

Balai Wilayah Sungai Maluku Utara. 2017. Laporan Akhir Sumber Daya Air Maluku Utara Dalam Angka. Ternate

BPSDM. 2018. Modul 3: Survey Hidrologi Dan Hidrometri.

Departemen Pekerjaan Umum. 2009. Prosedur Dan Instruksi Kerja Pengukuran Debit Sungai Dan Saluran Terbuka. Jakarta : Direktorat Jenderal Sumber Daya Air.

Eleiser. 2018. Studi kelayakan teknis pembangkit listrik tenaga mikrohidro di Desa Galala Kabupaten Halmahera Selatan. Skripsi Sarjana. Universitas Khairun.

IMIDAP. 2008. Pedoman Teknis Standardisasi Peralatan dan Komponen Pembangkit Listrik Tenaga Mikrohidro (PLTMH). Jakarta: Direktorat Jendral Listrik dan Pemanfaatan Energi, Departemen Energi dan Sumber Daya Mineral.

IMIDAP. 2009a. Buku 2A Pedoman Studi Kelayakan Hidrologi. Jakarta: Direktorat Jendral Listrik dan Pemanfaatan Energi, Departemen Energi dan Sumber Daya Mineral.

IMIDAP. 2009b. Buku 2C Pedoman Studi Kelayakan Mekanikal Elektrikal. Jakarta: Direktorat Jendral Listrik dan Pemanfaatan Energi, Departemen Energi dan Sumber Daya Mineral.

Kemeterian Energi dan Sumber Daya Mineral. 2012. Peraturan Menteri ESDM No. 04 tahun 2012 tentang harga pembelian tenaga listrik oleh PT PLN (Persero) dari pembangkit tenaga listrik yang menggunakan energi terbarukan skala kecil dan menengah.

Kemeterian Energi dan Sumber Daya Mineral. 2021. Rencana Umum Penyediaan Tenaga Listrik (RUPTL) PT Perusahaan Listrik Negara 2021 – 2030. Jakarta : Kemeterian Energi dan Sumber Daya Mineral.

Keputusan Bupati Halmahera Barat No. 136 tahun 2011 tentang Pembentukan Tim Pengarah Dan Tim Penyusun Rencana Pengelolaan Terpadu Daerah Aliran Sungai Akelamo Berlokasi Di Kecamatan Sahu Timur Kabupaten Halmahera Barat. 6 Juni 2011.

Nurhayati, Ai Sri. 2019. Sumber Energi Listrik Alternatif. Diakses pada 18 Juni 2022, dari https://sumber.belajar.kemdikbud.go.id/repos/FileUpload/sumber%20energi%20Tragedi%20Nasional/Topik-2.html.PLN. 2015. Buku 1 Data Dasar Untuk Perencanaan Pltmh. Jakarta : PLN Corporate University.

Pemerintah Indonesia. 2012. Peraturan Pemerintah nomor 14 tahun 2012 tentang kegiatan usaha penyediaan tenaga listrik.

PLN. 2015. Buku 3 Disain Mekanikal PLTM/H. Jakarta : PLN Corporate University.

PLN. 2022. The Role Of Hydrogen And Fuel Cell Technology In The Energy Transition In Indonesia.

PLN UP3 Sofifi. 2022. Laporan data asset Jaringan September 2022.

Prianto, Eko dan Nurhening Yuniarti. 2016. Pembangkit Tenaga Listrik.

Purwanto. 2017. Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Sebuah Pilihan : Belajar dari Koperasi Mekar Sari, Subang. Jakarta : LIPI Press.

Puspitarini, Handriyanti Diah. 2021. Beyond 443 GW Indonesia’s infinite renewable energy potentials. Jakarta : Institute for Essential Services Reform.

Ridwan, Muhammad, Iwan Gunawan, dan Said Hi Abbas. 2023. “Analisis Modifikasi Filter Fuel Caterpillar C15 Di Pusat Listrik Laiwui”. IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA) 2 (1):1-10. https://doi.org/10.56862/irajtma.v2i1.28.

Siaran Pers Kementerian ESDM RI Nomor : 389.Pers/04/SJI/2021 Tentang COP ke-26, Menteri ESDM Sampaikan Komitmen Indonesia Capai Net Zero Emission. 2 November 2021.

USAID. 2016. Pembiayaan Pembangkit ListrikTenaga Mini Hidro.

Published

2023-12-16

How to Cite

Nurharyanto, R. T. ., & Gunawan, I. (2023). Technical Feasibility Study of Mini Hydro Renewable Energy Potential in Goal Village, East Sahu District, West Halmahera Regency. IRA Jurnal Teknik Mesin Dan Aplikasinya (IRAJTMA), 2(3), 44–54. https://doi.org/10.56862/irajtma.v2i3.85

Issue

Section

Scientific Article